dots bg

EM - Y2V2_Practical_V1.3

Course Instructor MAHA SKILLS

FREE

To enroll in this course, please contact the Admin
dots bg

Course Overview

Schedule of Classes

Course Curriculum

1 Subject

EM - Y2V2_Practical_V1.3

59 Learning Materials

Module 8: Fiber Optic Communication

Ex 200 - Identify the resources and their need on the given fiber optic trainer kit.

Ex 201 - Make optical fiber setup to transmit and receive analog and digital data.

Ex 202 - Set up the OFC trainer kit to study AM, FM, PWM modulation and demodulation.

Ex 203 - Perform FM modulation and demodulation using OFC trainer kit using audio signal

Ex 204 - Perform PWM modulation and demodulation using OFC trainer kit using audio signal

Ex 205 - Perform PPM modulation and demodulation using OFC trainer kit using audio signal

Module 9: Digital Panel Meter

Ex 206 - Identify LED Display module and its decoder/driver ICs

Ex 207 - Display a word on a two line LED

Ex 208 - Measure/current flowing through a resistor and display it on LED Module

Ex 209 - Measure/current flowing through a sensor and display it on a LED module (DPM)

Ex 210 - Identify LCD Display module and its decoder/driver ICs

Ex 211 - Measure/current flowing through a resistor and display it

Module 10: SMPS And Inverter

Ex 212 - Identify the components/devices and draw their corresponding symbols.

Ex 213 - Dismantle the given stabilizer and find major sections/ ICs components.

Ex 214 - List the defect and symptom in the faulty SMPS.

Ex 215 - Measure / Monitor major test points of computer SMPS.

Ex 216 - Troubleshoot the fault in the given SMPS unit. Rectify the defect and verify the output

Ex 217 - Use SMPS used in TVs and PCs for Practice.

Ex 218 - Install and test the SMPS in PC.

Ex 219 - Install and test an inverter

Ex 220 - Troubleshoot the fault in the given inverter unit. Rectify the defects and verify

Ex 221 - Construct and test IC Based DC-DC converter for different voltages.

Ex 222 - Construct and test a switching step down regulator using LM2576

Ex 223 - Construct and test a switching step up regulator using MC 34063

Module 11: UPS

Ex 224 - Connect battery stack to the UPS.

Ex 225 - Identify front panel control & indicators of UPS

Ex 226 - Connect Battery & load to UPS & test on battery mode

Ex 227 - Open top cover of a UPS; identify its isolator transformers, the UPS transformer

Ex 228 - Identify the various test point and verify the voltages on these.

Ex 229 - Identify various circuit boards in UPS and monitor voltages at various test points.

Ex 230 - Perform load test to measure backup time.

Module 12: Solar Power (Renewable Energy System)

Ex 231A - Wire a solar controller to a battery storage station.

Ex 231B - Install a solar panel to a roof

Ex 232 - Connect storage batteries to a power inverter

Ex 233 - Connect and test solar panel to the Inverter and run the load.

Ex 234 - Install a solar power to charge a rechargeable 12 V DC battery and find out the charge

Ex 235 - Install a Solar Inverter

Module 13: Cell Phones

Ex 236 - Dismantle, identify the parts and assemble different types of smart phones.

Ex 237 - Dismantle the cell phone/smart phone remove the key pad and clean it,

Ex 238 - Interface the cell phone/smart phone to the PC and transfer the data card.

Ex 239 - Flash the various brands of cell phone/smart phone (at least 3).

Ex 240 - Format the cell phone/ smart phone for virus (approach the mobile repair shop)

Ex 241 - Perform the interfacing of cell phone/smart phone to the PC and dismantle the cell phone

Ex 242A - Unlock the handsets through codes and software

Ex 242B - Find out the fault of basic cell phone system. Rectify the fault in ringer section

Ex 243 - Replace various faulty parts like mic, speaker

Module 14: LED Lights

Ex 244 - Dismantle the LED light, identify the connections of LEDs stacks, protection circuits

Ex 245 - Identify the rectifier, controller part of LED lights.

Ex 246 - Make series string connection of six LED’s and connect four Series strings in parallel.

Ex 247 - Connect to such parallel sets in Series to create a matrix of LED’s.

Ex 248 - Apply suitable voltage and check Voltage across series strings.

Module 15: LCD And LED TV

Ex 249 - Identify and operate different Controls on LCD, LED TV.

Ex 250 - Identify components and different sectors of LCD and LED TV.

Ex 251 - Dismantle; Identify the parts of the remote control.

Ex 252 - Dismantle the given LCD/LED TV to find faults with input stages through connectors.

Ex 253 - Detect the defect in a LED/LCD TV receiver given to you. Rectify the fault.

Ex 254 - Troubleshoot the faults in the given LED/LCD TV receiver. Locate and rectify the faults.

Ex 255 - Test LED/LCD TV after troubleshooting the defects.

Ex 256 - Identify various connectors and connect the cable operators external decoder to the TV.

Course Instructor

tutor image

MAHA SKILLS

538 Courses   •   127459 Students